Since 2010, Prombudkoliya has been operating in the field of construction and maintenance of railway infrastructure. We perform a full range of works related to the preparation and commissioning of railway facilities. Our scope includes preparation of as-built documentation, conducting tests, interaction with regulatory authorities, and obtaining permits for commissioning facilities into operation.
We support the client at all stages — from completion of construction to receipt of official certificates and approvals. All works are carried out in strict compliance with the requirements of Ukrzaliznytsia, DBN regulations, and current legislation of Ukraine.
Prombudkoliya prepares a complete package of as-built documentation, including certificates of hidden works, inspection logs, material passports, test reports, and laboratory analysis protocols. Compliance of the facility with design solutions and technical conditions is verified.
Tests are carried out for railway tracks, turnouts, overhead contact systems, signaling, communication, and power supply systems. Based on the results, readiness certificates and technical conclusions confirming compliance with train operation safety standards are issued.
We organize commission acceptance with the participation of representatives of the client, contractor, technical supervision, and regulatory authorities. All remarks are eliminated in the shortest possible time, after which the facility is put into operation.
Prombudkoliya supports the process of obtaining expert conclusions, acceptance certificates, and official commissioning permits. We interact with Ukrzaliznytsia, the State Architectural and Construction Inspectorate, and other authorities until the approved documentation is received.
Acceptance certificates were prepared, track and signaling systems were tested. The facility was commissioned within 45 days after completion of construction.
Inspection, preparation of as-built documentation, commission acceptance, and receipt of commissioning approval were completed.
Comprehensive commissioning with certificates, test protocols, and expert conclusions. All documents were approved without comments.
The average timeframe for preparation and acceptance is 30 to 60 days, depending on complexity and the number of approvals required.
The commission includes representatives of the client, general contractor, technical supervision, Ukrzaliznytsia, and state inspection authorities.
Yes. Prombudkoliya provides services for preparation and coordination of as-built documentation even for facilities constructed by other contractors.
Need to commission a railway facility? Submit a request, and Prombudkoliya specialists will audit the documentation, organize the acceptance commission, and provide full support until commissioning approval is obtained.
Contact us
Mon – Fri 08:00 – 20:00