Prombudkoliya has been constructing access railway tracks for industrial enterprises, warehouses, terminals, and logistics complexes since 2010. We deliver turnkey projects — from engineering surveys and design to commissioning. All works are performed in accordance with Ukrzaliznytsia standards, DBN regulations, and the customer’s technical requirements.
Our company provides a full cycle: design, supply of materials, construction of the track superstructure, installation of level crossings, turnouts, and drainage systems.
Access tracks connect enterprises to main railway lines and play a key role in transport logistics. They are designed taking into account cargo turnover, rolling stock types, shunting operations, and production specifics. Prombudkoliya develops solutions that minimize operating costs and increase line capacity.
We carry out topographic surveys, route alignment, track profile calculations, hydrology studies, drainage, and water runoff design. We prepare design documentation and support approvals with Ukrzaliznytsia and regulatory authorities.
We perform site clearing, grading, construction of the subgrade and sub-ballast layer. If required, the base is reinforced using geosynthetic materials and drainage systems.
Laying of reinforced concrete sleepers, rails of types R50 and R65, installation of turnouts, ballast works, and stabilization. Mechanized equipment is used to accelerate installation and alignment.
Construction of road level crossings, decking, bridge crossings, drainage and stormwater systems, fencing, and lighting. All elements comply with traffic safety and industrial operation requirements.
Upon completion of works, geometry control, load testing, and acceptance documentation are carried out. The facility is handed over to the client in a fully operational condition.
Design and construction of a 5.8 km branch line, installation of turnouts and a drainage system. The facility was commissioned within 4 months.
3.2 km of track were laid, level crossings and turnout assemblies were installed. Implementation period — 75 days, without disrupting the enterprise’s production cycle.
2.5 km of access tracks were constructed with connection to the mainline. Testing was conducted, as-built documentation was prepared, and an operating permit was issued.
We construct tracks of any length — from several hundred meters to multi-kilometer sections.
Yes, all projects are approved by Ukrzaliznytsia and undergo expert review for subsequent connection to the main railway network.
Yes, works are carried out in stages without stopping production processes and with minimal traffic restrictions.
Planning the construction of access railway tracks? Submit a request, and Prombudkoliya specialists will prepare a project, cost estimate, and work schedule tailored to your facility.