Since 2010, Prombudkoliya has been carrying out the arrangement of railway level crossings and adjacent infrastructure. We implement comprehensive solutions aimed at improving traffic safety, driver comfort, and the durability of operational elements of level crossings.
All works are performed in accordance with the requirements of Ukrzaliznytsia, DBN V.2.3-19, and applicable standards for level crossing infrastructure. We provide a full cycle — from design and approvals to commissioning of the facility.
Arrangement of a level crossing includes a set of engineering, construction, and organizational measures that ensure safe crossing of railway tracks by road vehicles and pedestrians. Properly executed works help prevent accidents, improve driving comfort, and extend the service life of the track.
Installation of reinforced concrete, combined, or rubber-panel decking systems. The decking ensures smooth vehicle passage and protects rails from mechanical impacts.
Asphalting of access road sections, installation of curbs, slope grading, and restoration of shoulders. Pavement is formed taking into account loads and gradients to prevent water accumulation.
To prevent damage to the pavement and decking, surface and subsurface drainage systems are installed. Existing channels are cleaned, and drainage pipes are laid.
Installation of signal posts, barriers, metal and plastic fences, as well as “Railway Crossing” signs in accordance with DSTU 4100.
Installation of lighting poles, floodlights, and connection to power supply to ensure visibility during nighttime. Energy-efficient LED systems with automatic control are used.
In areas with high pedestrian traffic, pedestrian crossings over railway tracks are arranged. Decking, handrails, fences, and warning signs are installed.
Installation of reinforced concrete decking, asphalting of approaches, installation of drainage and lighting systems. Preparation of as-built documentation and commissioning of the facility were completed.
Replacement of decking slabs, restoration of asphalt pavement, and installation of new road signs. Works were completed within 5 days without restricting train traffic.
Installation of a drainage system, LED lighting, and metal safety fences. The facility was commissioned with a positive conclusion from Ukrzaliznytsia.
We use reinforced concrete slabs, combined decking systems, and rubber-panel decking that comply with Ukrzaliznytsia standards and provide durability and load resistance.
Yes, part of the works is carried out during maintenance windows or with partial restriction of road traffic, without stopping train operations.
Yes, Prombudkoliya installs lighting systems, road signs, barriers, and other safety elements for level crossings.
It is recommended to conduct inspections and preventive maintenance every 12 months, and major repairs every 5–7 years.
Need to arrange or modernize a railway level crossing? Submit a request, and Prombudkoliya specialists will carry out all works on a turnkey basis — from design and material supply to asphalting, lighting, and commissioning.