Prombudkoliya has been providing professional installation and laying of railway tracks of any complexity category since 2010. We deliver a full cycle of works — from base preparation to alignment, stabilization, and commissioning of the track. All works are performed in accordance with Ukrzaliznytsia regulations, DBN standards, and international quality standards.
Our team consists of experienced engineers, installers, and track machine operators, enabling us to complete projects within short timeframes with guaranteed precision and reliability.
We build tracks on mainline, industrial, and station sections. The works include construction of the subgrade, ballast laying, installation of sleepers and rails, installation of turnouts, and verification of track geometry.
Prombudkoliya performs assembly and installation of turnouts of all types: 1/9, 1/11, 1/18 for rails R50–R75. The works include adjustment of moving parts, installation of drives, and testing of the mechanism. Accurate alignment and smooth movement of rolling stock are guaranteed.
We replace worn sleepers and rails, correct track geometry, restore the ballast layer, and modernize turnout assemblies. Works are carried out on active lines without complete suspension of train traffic.
Prombudkoliya constructs and repairs access tracks for enterprises, logistics complexes, ports, and terminals. We provide full track infrastructure works — from the base to connecting turnouts and level crossings.
Construction of 4.8 km of track with installation of two turnouts. The works were completed within 40 days in compliance with all technical standards.
Sleepers and rails were replaced on a 3 km section, with track alignment and stabilization performed. The facility was commissioned without stopping train traffic.
2 km of track were laid, drainage systems and a level crossing were installed. The line was commissioned with full documentation completed.
Depending on the category and site conditions — from 10 to 20 days, including alignment and commissioning.
R50 and R65 rails, reinforced concrete sleepers of types I and II, elastic and bolted fastenings, and certified granite ballast.
Yes, installation and repair works are carried out in stages without complete traffic suspension, using mechanized systems and scheduled maintenance windows.