Since 2010, Prombudkoliya has been carrying out installation, commissioning, and maintenance of level crossing automation systems at railway crossings. We implement comprehensive solutions to ensure the safety of road traffic and train operations, installing modern equipment and integrated signaling systems in accordance with Ukrzaliznytsia and DSTU requirements.
Our specialists are certified to perform works on signaling, interlocking, and block systems (SCB) and deliver turnkey projects — from initial preparation to commissioning.
Level crossing automation coordinates traffic at intersections of railways and roads, preventing accidents and ensuring safe conditions for drivers and train operators. Systems include traffic signals, barriers, audible and visual alarms, as well as control controllers and train-approach detection sensors.
Development of design documentation for level crossing automation with approval by Ukrzaliznytsia signaling and communications departments. Technical parameters of equipment, connection diagrams, and system operating logic are defined.
Installation of barriers, traffic signals, masts, sensors, cable routes, and control cabinets. Laying of communications and connection of equipment to power supplies and signaling systems.
Configuration of equipment logic, verification of signal synchronization, and correct system response to approaching trains. Testing of audible and visual devices, as well as interaction with dispatch control centers.
Connection of automation systems to centralized traffic control systems. If required, communication interfaces with station duty officers and monitoring panels are installed.
Regular inspection of level crossing automation, replacement of lamps and batteries, lubrication of barrier drives, and software updates for control units.
New barriers, traffic signals, and audible warning systems were installed. Equipment commissioning and integration with the station control network were completed. The system successfully passed inspection by Ukrzaliznytsia SCB services.
Replacement of outdated signals with LED units, installation of a new controller, and backup power supply. Reliability and response speed of the automation system were significantly improved.
Full installation of equipment — barriers, approach sensors, audible signaling, and controllers. Successful integration with station dispatching systems was completed.
We install mechanical and electronic level crossing automation systems, including signals, barriers, motion sensors, controllers, and communication systems.
Yes, individual components (signals, controllers, sensors) can be upgraded and integrated into the existing system without complete dismantling.
On average, installation and commissioning take from 7 to 15 calendar days, depending on project complexity and communication length.
Yes, Prombudkoliya supports the project at all stages — from technical specifications to approval and official commissioning.
Need to install or modernize level crossing automation? Submit a request, and Prombudkoliya specialists will perform installation, commissioning, and system integration with a guarantee of reliable operation and full compliance with Ukrzaliznytsia requirements.