Acceptance and handover certificates
About the Company
Since 2010, Prombudkoliya has been providing services for the preparation and formalization of acceptance and handover certificates for railway facilities after construction, reconstruction, and major overhaul. We prepare a complete set of documents, support the acceptance procedure, and ensure coordination with representatives of Ukrzaliznytsia and regulatory authorities.
The acceptance and handover certificate is a key document confirming the facility’s readiness for operation and its compliance with design, as-built, and regulatory documentation.
Purpose of the Acceptance and Handover Certificate
The acceptance and handover certificate records the completion of construction and installation works, verification of quality, and compliance with technical requirements. It is required for official commissioning, transfer to the operational balance, and commencement of operation of a railway section or facility.
Facilities Subject to Acceptance
- Railway tracks and turnouts
- Railway level crossings, stations, and platforms
- Industrial access tracks and sidings
- Engineering structures (bridges, drainage and water disposal systems)
- Track superstructure facilities after major overhaul
- Locomotive depots, maintenance areas, and technical buildings
Stages of Acceptance Certificate Preparation
- Verification of facility readiness and as-built documentation
- Inspection and performance of control measurements
- Preparation of a preliminary inspection report
- Verification of elimination of comments (if any)
- Preparation and signing of the acceptance and handover certificate by the commission
- Approval of the certificate with Ukrzaliznytsia and submission to the client
Composition of the Acceptance Commission
- Representatives of the client
- Contractor (executing organization)
- Technical supervision engineer
- Representative of Ukrzaliznytsia (track, signaling, or communications services)
- Author’s supervision representative
- If required — representatives of local authorities and the State Architectural and Construction Inspectorate
List of Documents Required for Acceptance
- As-built documentation (drawings, schematics, concealed works certificates)
- Testing and inspection reports for structures and systems
- Construction and technical supervision logs
- Reports on geodetic measurements and laboratory tests
- Facility passport and explanatory note
- Conclusions and approvals from Ukrzaliznytsia and related services
Our Services
- Preparation of a complete documentation package for facility handover
- Organization and support of the acceptance commission
- Verification of completeness of as-built documentation
- Approval of certificates and protocols with Ukrzaliznytsia
- Preparation of the final acceptance and handover certificate in the approved format
- Consultations on elimination of comments and preparation for commissioning
Our Capabilities
- Preparation of acceptance certificates for facilities of any complexity
- Experience in cooperation with Ukrzaliznytsia, SACI, and design institutes
- Support of acceptance procedures for industrial and mainline facilities
- Preparation of documentation in electronic and hard-copy formats
- Compliance with ISO standards and Ukrzaliznytsia requirements
- Guaranteed successful completion of acceptance procedures
Company Advantages
- 15 years of experience in turnkey acceptance of railway facilities
- Comprehensive approach — from as-built documentation to acceptance certificate
- In-house engineers, designers, and legal specialists
- Full compliance with DBN and Ukrzaliznytsia regulatory requirements
- Minimization of approval timelines and elimination of comments
- Transparent support and reporting at all stages
Examples of Completed Projects
Acceptance Certificate for Station Reconstruction (Dnipro, 2023)
A complete documentation package was prepared, the acceptance commission was organized, and the acceptance certificate was issued. The facility was accepted by Ukrzaliznytsia without comments and commissioned.
Handover of an Industrial Access Track (Odesa Region, 2022)
Inspection and preparation of the acceptance certificate were carried out. The documents were approved by Ukrzaliznytsia and the State Architectural and Construction Inspectorate, and the track was commissioned with the highest safety category.
Acceptance of a Level Crossing after Major Overhaul (Poltava Region, 2021)
Inspection certificates were prepared, signaling and decking were tested, and the acceptance certificate was issued with the participation of railway and client representatives.
Frequently Asked Questions
Who signs the acceptance and handover certificate?
The certificate is signed by all members of the commission — representatives of the client, contractor, technical supervision, Ukrzaliznytsia, and other involved organizations.
Is it possible to issue the certificate without a Ukrzaliznytsia representative?
No. For railway facilities, the participation of a Ukrzaliznytsia track service representative or an authorized engineer is mandatory.
What should be done if the commission identifies comments?
Comments are recorded in a separate list. After their elimination, a repeated acceptance inspection is carried out and the final certificate is signed without restrictions.
In what format is the certificate provided?
The certificate is issued in hard copy with signatures and official seals of all parties, as well as in electronic format (PDF, DOC) for archiving and further approvals.
Submit a Request
Need to formalize the acceptance and handover of a railway facility? Submit a request, and Prombudkoliya specialists will prepare a complete documentation package, organize the commission, and ensure official commissioning of your facility.
Contact us