Since 2010, Prombudkoliya has been providing engineering design services for railway facilities of various purposes — from industrial sidings to mainline railways, stations, and level crossings. We deliver a full design cycle: from engineering surveys and calculations to project approval and construction supervision.
The company’s design solutions are based on many years of experience, modern engineering technologies, and strict compliance with Ukrzaliznytsia regulations, DBN standards, and European railway design requirements.
Engineering design covers all stages of railway infrastructure development. We design railway tracks, level crossings, stations, depots, bridges, and engineering utilities, taking into account geological, hydrological, and operational conditions.
Design of railway alignments, stations, turnouts, switch zones, arrival and departure tracks, and shunting areas. Calculation of longitudinal and transverse profiles, layouts of track facilities, and engineering networks.
Design of railway sidings for factories, terminals, warehouses, and logistics centers. Includes calculations of freight flows, line capacity, shunting operations, and technical conditions for connection to the main railway network.
Design of road-rail level crossings, tunnels, bridges, drainage, and water management systems. Projects include traffic schemes, deck structures, signaling, safety, and lighting systems.
Development of design solutions for locomotive and wagon depots, repair workshops, maintenance yards, fueling and washing facilities. Includes engineering system calculations, access tracks, and power supply schemes.
Design of reconstruction projects for railway lines, stations, and industrial branches. Includes strengthening of foundations, replacement of track superstructure elements, installation of new turnouts, and modernization of engineering systems.
Engineering surveys, route alignment, and full design documentation were completed for a 5.2 km railway line. The project passed expert review and was approved by Ukrzaliznytsia.
A project for modernization of track facilities, turnouts, and the drainage system was developed. The project was implemented within tight deadlines without interrupting train operations.
Foundation calculations, track layout design, engineering systems, and technological service areas were developed. The facility was commissioned with a positive expert conclusion.
Yes, Prombudkoliya provides individual design stages — engineering surveys, working documentation, project approval, or author’s supervision.
Design and working documentation, calculations, drawings, specifications, explanatory notes, bills of quantities, and cost estimates.
The timeframe depends on the scale and complexity of the project — from 30 to 120 days, including approval procedures.
Need engineering design for a railway facility? Submit a request, and Prombudkoliya specialists will develop a project tailored to your technical and operational requirements with a complete package of approved documentation.
Contact us
Mon – Fri 08:00 – 20:00