Since 2010, Prombudkoliya has been providing services for the preparation of as-built (executive) documentation for railway construction, reconstruction, and repair projects. We prepare a complete set of as-built drawings, certificates, and logs in accordance with the requirements of Ukrzaliznytsia, DBN standards, and construction supervision regulations.
As-built documentation is a mandatory part of commissioning a facility and confirms that the completed works comply with the approved design, technical conditions, and safety regulations.
As-built documentation records the actual parameters, quantities, and results of construction and installation works. It is required for commissioning the facility, transferring it to the balance of Ukrzaliznytsia, and for subsequent maintenance and repair activities.
Prepared based on geodetic measurements and surveys. They reflect the actual position of railway tracks, turnouts, engineering networks, structures, and utilities. The drawings are issued in both electronic and hard-copy formats and signed by responsible parties.
Confirm the quality of work stages that become inaccessible for visual inspection after construction is completed (such as formation layers, ballast layers, drainage, and water disposal systems).
Record the progress and sequence of works, materials used, equipment involved, working conditions, and quality control results.
Document the results of inspections and tests of installed systems and structures, including turnout testing, track strength verification, drainage systems, and engineering utilities.
Includes geodetic surveying of constructed track sections, determination of actual coordinates and elevations. Based on these data, as-built plans and longitudinal and transverse profiles are prepared.
Contains consolidated data on completed works, deviations from the design, quantities of materials used, and the condition of the facility after construction. Prepared for submission to the client and regulatory authorities.
As-built diagrams of tracks, turnouts, cable routes, and drainage systems were prepared. The documentation was accepted by Ukrzaliznytsia without comments.
As-built route drawings were prepared, certificates of concealed works and testing were issued. The documentation was approved and handed over to the client.
Geodetic surveying was carried out, and plans and profiles were prepared. The documentation was used for commissioning the facility.
As-built drawings, concealed works certificates, testing reports, construction logs, geodetic diagrams, and a final technical report.
The documentation is prepared by the contractor and signed by representatives of the client, technical supervision, and author’s supervision.
Yes, retrospective preparation is possible based on available data, measurements, and photographic records, provided that the completed works can be reliably confirmed.
The documentation is delivered in hard copy with signatures and seals, as well as in electronic formats (DWG, PDF, XLS, DOC) for the client’s archive.
Need as-built documentation for a railway facility? Submit a request, and Prombudkoliya specialists will prepare a complete set of documents, certificates, and drawings for commissioning your project.