Prombudkoliya has specialized in the design of railway tracks and transport infrastructure facilities since 2010. We carry out engineering surveys, structural and calculation works, and coordinate documentation with Ukrzaliznytsia and regulatory authorities. Our projects are implemented for industrial enterprises, terminals, logistics complexes, and government clients.
The company’s design solutions are distinguished by precision, cost efficiency, and practicality. We develop routes taking into account geology, terrain, and operational requirements, ensuring traffic safety and optimal construction conditions.
Prombudkoliya provides design services for railway lines, turnouts, stations, and access tracks. The scope of work includes topographic surveys, engineering-geological and hydrological studies, route alignment, load calculations, design of the subgrade, drainage systems, and ballast layers.
We develop railway branch designs for enterprises in various industries — metallurgy, agriculture, logistics, petrochemicals, and port infrastructure. Projects include shunting schemes, connections to main lines, and capacity calculations.
We design track reinforcement, replacement of rails, sleepers, and turnouts, optimization of the subgrade profile, expansion of station areas, and reconfiguration of utility networks. All solutions are aimed at increasing speed and line capacity.
Company engineers provide author’s supervision at project sites, monitor the accuracy of design implementation, maintain technical documentation, and participate in the approval of changes during construction.
A design was developed for a 5.4 km section with connection to the mainline, installation of a turnout, and a drainage system. The project passed expert review without comments.
The project included reinforcement of the subgrade, replacement of turnouts, and modernization of level crossings. Completion time — 45 days.
A shunting scheme, signaling system, and power supply system were developed. The facility was commissioned in 2022.
The design timeframe depends on project complexity and ranges from 30 to 90 days with full coordination support.
Yes, we provide individual stages — engineering surveys, approvals, author’s supervision, or preparation of cost estimates.
We deliver a full set of drawings, calculations, specifications, an explanatory note, feasibility study, and a digital route model for subsequent construction.
Do you need to develop a railway track project? Submit a request, and Prombudkoliya specialists will prepare a preliminary solution and cost estimate tailored to your site conditions.
Contact us
Mon – Fri 08:00 – 20:00